Intervention details

Renovation of a condominium building consisting of 2 units. A series of interventions were carried out, including:

• Insulation of the external walls with an overcoat system;
• Renovation of the roof;
• Replacement of all windows and doors;
• Replacement of existing boilers;
• Installation of photovoltaic panels on the roof.

Our firm took care of the design of the insulation and installations, site safety coordination, and full management of the paperwork for building bonuses.

Year:

2023

Location:

Zogno (BG)

Building type:

Condominium

Type of intervention:

Renovation

Performed services:

Plant and thermal engineering design, building bonus management, safety coordination

Achievements

No. of building units

m2

Co2 saved Kg/yr

Evolution of the project

before
DURing
after